EMC China Lab

What is a UL Test Report?

Views :
Update time : 2024-06-08

Introduction to UL Test

As Amazon's strategic position in global commerce continues to improve, products with electrical connections need relevant UL reports to be listed on Amazon. Test reports issued by laboratories with ISO 17025 qualifications are required for normal sales and restoration of links. If the products purchased by competitors or customers do not have safety reports of relevant standards, competitors or customers will entrust American lawyers to send letters to Amazon, requesting that the company's products be stopped from being sold, and apply for court proceedings to destroy all of the company's products on Amazon, which may mean that the company is basically driven out of the North American market. Many sellers reported receiving relevant email notifications, and their products were suspended from sale and listings were removed from the shelves due to the inability to provide ul test reports within the specified time.

 

The difference between UL certification and UL test report

UL certification: a voluntary certification that requires product testing and factory audits, which are conducted every quarter. It is expensive, time-consuming, and the factory audits are very strict.

UL test report: After the product is tested according to the corresponding UL standard, a qualified test report will be issued. Low cost, short cycle, no factory inspection required. Can be used for Amazon audit, invalid for customs clearance.

 

2. UL Certification Mark

Logo not found

 

3. UL Certification Standards

product

Safety Standards

Power Products

UL62368-1/ul1310/UL1012/ul2056/

UL2089/UL458/UL697/UL60601-1

IT/AV Products

UL62368-1

Wireless Products

UL62368-1

Lighting products

UL1598/UL153/UL1786/UL1573/

UL588/UL2108/UL924/UL1993/UL8750

Battery Products

ul1642/ul2054/UL2056/UL2271/UL2580/ul1973

Electric vehicle products

UL2849/UL2272

Home appliance

UI1007/UL1005/UL1028/UL1083/UL982/ul1026

Industrial Transformer

UL1310/UL1012/UL506/UL1561/UL1562/

UL1585/UL1876/UL1411/UL397/UL697

 

IV. UL Required Information

1. Company information form and business license copy (for customers applying for UL for the first time).

2. Product description: product name, product model, etc.

3. Parts list: Provide the name and model, rating, and manufacturer information of the product parts. If the parts have been ul certified, please indicate the UL file number of the parts. If there are multiple suppliers for a certain part, they can be provided together.

4. Performance and specifications: such as size, rated voltage, current, frequency and power, etc.

5. Structural drawing or exploded view: Structural drawing of the product. Please indicate the names of each part in the drawing so that they correspond one to one with the parts list.

6. Circuit schematic diagram Please provide the circuit schematic diagram: PCB schematic diagram PCB LAYOUT.

7. Product photos, instructions for use, safety precautions or installation instructions, etc.

 

5. UL Certification Process

1.The applicant submits an application.

2. The applicant fills in the application form and provides instructions and technical documents.

3. Determine the test standards and test items and provide a quotation.

4. The applicant confirms the quotation and submits samples and relevant technical documents.

5. A fee notice will be issued to the applicant, who will pay the certification fee according to the fee notice.

6. Arrange products for testing.

7. If the test fails, notify the applicant and allow the applicant to improve the product.

This process continues until the test is passed. The applicant should make changes to the technical information in the original application to reflect the actual situation after the change.

8. Provide UL test report to the applicant if the test is qualified.

 

VI. Certification cycle and validity period

The UL test report cycle is 5-7 working days.

If the American UL test standards used are not updated, the UL test report is valid for a long time.

 

7. Factory Inspection

UL test reports do not require factory inspection

 

US UL test report

Logo not found

·Test content: Safety regulations
·Applicable products:
·Is it mandatory: Yes/No
·Factory inspection: Yes/No
·Local agent: Yes/No
·Plug type: *standard/**type
·Voltage requirement: **V
·Application method: Direct application; Transfer application (**certificate can be transferred, **report can be transferred)
·Certificate validity period: **years/long term (re-application is required for standard change)
·Other supplements:


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
EU Walkie-Talkie Testing Standards (30MHz–1000MHz) EU Walkie-Talkie Testing Standards (30MHz–1000MHz)
01 .01.2026
JJR Lab tests EU walkie-talkies (30–1000MHz) per EN 300086/113/296/219/341/390/301166/302561 for ana...
EU Compliance Certification Requirements for Tread EU Compliance Certification Requirements for Tread
01 .01.2026
EU Compliance Certification for Treadmills: meet EN60335-1, EN ISO20957-6:2021, EN ISO12100; tested ...
EU Amazon & TEMU Compliance for Wireless Produ EU Amazon & TEMU Compliance for Wireless Produ
01 .01.2026
EU Amazon & TEMU wireless products require CE-RED & EN 18031 compliance. JJR Lab provides te...
Bluetooth BQB Compliance Protocol Testing Bluetooth BQB Compliance Protocol Testing
01 .01.2026
Bluetooth BQB Testing by JJR ensures devices meet SIG standards for GATT, A2DP, HFP and BLE via inte...
Audio-Visual Equipment CE EN 62368 Testing Process Audio-Visual Equipment CE EN 62368 Testing Process
01 .01.2026
Audio-Visual Equipment CE EN 62368 testing ensures EU safety compliance. JJR Laboratory provides EN ...
Amazon Portable Power Station Direct Validation Gu Amazon Portable Power Station Direct Validation Gu
01 .01.2026
Amazon Portable Power Station Direct Validation Guide: Meet UL2743/UL2056/IEC62368+62133/UN38.3 via ...
What is the Japan PSE JIS C 62368-1:2020 Test What is the Japan PSE JIS C 62368-1:2020 Test
01 .01.2026
JJR Laboratory provides Japan PSE JIS C 62368-1:2020 testing covering insulation, voltage, grounding...
JIS C 62368-1 Electrical Safety Testing Standard JIS C 62368-1 Electrical Safety Testing Standard
01 .01.2026
JIS C 62368-1 Electrical Safety Testing Standard for PSE compliance with JJR Lab testing: ensures AV...

Leave Your Message