EMC China Lab

What is a UL Test Report?

Views :
Update time : 2024-06-08

Introduction to UL Test

As Amazon's strategic position in global commerce continues to improve, products with electrical connections need relevant UL reports to be listed on Amazon. Test reports issued by laboratories with ISO 17025 qualifications are required for normal sales and restoration of links. If the products purchased by competitors or customers do not have safety reports of relevant standards, competitors or customers will entrust American lawyers to send letters to Amazon, requesting that the company's products be stopped from being sold, and apply for court proceedings to destroy all of the company's products on Amazon, which may mean that the company is basically driven out of the North American market. Many sellers reported receiving relevant email notifications, and their products were suspended from sale and listings were removed from the shelves due to the inability to provide ul test reports within the specified time.

 

The difference between UL certification and UL test report

UL certification: a voluntary certification that requires product testing and factory audits, which are conducted every quarter. It is expensive, time-consuming, and the factory audits are very strict.

UL test report: After the product is tested according to the corresponding UL standard, a qualified test report will be issued. Low cost, short cycle, no factory inspection required. Can be used for Amazon audit, invalid for customs clearance.

 

2. UL Certification Mark

Logo not found

 

3. UL Certification Standards

product

Safety Standards

Power Products

UL62368-1/ul1310/UL1012/ul2056/

UL2089/UL458/UL697/UL60601-1

IT/AV Products

UL62368-1

Wireless Products

UL62368-1

Lighting products

UL1598/UL153/UL1786/UL1573/

UL588/UL2108/UL924/UL1993/UL8750

Battery Products

ul1642/ul2054/UL2056/UL2271/UL2580/ul1973

Electric vehicle products

UL2849/UL2272

Home appliance

UI1007/UL1005/UL1028/UL1083/UL982/ul1026

Industrial Transformer

UL1310/UL1012/UL506/UL1561/UL1562/

UL1585/UL1876/UL1411/UL397/UL697

 

IV. UL Required Information

1. Company information form and business license copy (for customers applying for UL for the first time).

2. Product description: product name, product model, etc.

3. Parts list: Provide the name and model, rating, and manufacturer information of the product parts. If the parts have been ul certified, please indicate the UL file number of the parts. If there are multiple suppliers for a certain part, they can be provided together.

4. Performance and specifications: such as size, rated voltage, current, frequency and power, etc.

5. Structural drawing or exploded view: Structural drawing of the product. Please indicate the names of each part in the drawing so that they correspond one to one with the parts list.

6. Circuit schematic diagram Please provide the circuit schematic diagram: PCB schematic diagram PCB LAYOUT.

7. Product photos, instructions for use, safety precautions or installation instructions, etc.

 

5. UL Certification Process

1.The applicant submits an application.

2. The applicant fills in the application form and provides instructions and technical documents.

3. Determine the test standards and test items and provide a quotation.

4. The applicant confirms the quotation and submits samples and relevant technical documents.

5. A fee notice will be issued to the applicant, who will pay the certification fee according to the fee notice.

6. Arrange products for testing.

7. If the test fails, notify the applicant and allow the applicant to improve the product.

This process continues until the test is passed. The applicant should make changes to the technical information in the original application to reflect the actual situation after the change.

8. Provide UL test report to the applicant if the test is qualified.

 

VI. Certification cycle and validity period

The UL test report cycle is 5-7 working days.

If the American UL test standards used are not updated, the UL test report is valid for a long time.

 

7. Factory Inspection

UL test reports do not require factory inspection

 

US UL test report

Logo not found

·Test content: Safety regulations
·Applicable products:
·Is it mandatory: Yes/No
·Factory inspection: Yes/No
·Local agent: Yes/No
·Plug type: *standard/**type
·Voltage requirement: **V
·Application method: Direct application; Transfer application (**certificate can be transferred, **report can be transferred)
·Certificate validity period: **years/long term (re-application is required for standard change)
·Other supplements:


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
Accelerated Ageing Test Accelerated Ageing Test
03 .02.2026
Sunlight (UV, heat) per International Electrotechnical Commission IEC 60068-2-5 to verify electronic...
IP Ingress Protection Testing IP Ingress Protection Testing
03 .02.2026
IP ingress protection testing checks enclosures against touch, dust, and water. Ratings like IP67 de...
How Does a Product Get an Energy Star Label How Does a Product Get an Energy Star Label
03 .01.2026
Products earn the Energy Star label by passing EPA energy-efficiency testing. JJR LAB provides certi...
Is ROHS part of UL the same Is ROHS part of UL the same
03 .01.2026
RoHS limits hazardous chemicals in products (EU); UL ensures product safety (US). Compliance in one ...
What is Protection Class EN 60529? What is Protection Class EN 60529?
02 .28.2026
EN 60529 defines IP codes for dust/water protection; higher digits = better. JJR LAB tests IP rating...
IP69 Certified Protection IP69 Certified Protection
02 .28.2026
IP rating ensures product dust/water protection. JJR Lab offers IP69 tests (IEC 60529/ISO 20653). Ch...
California Energy Commission Testing Lab California Energy Commission Testing Lab
02 .28.2026
California Energy Commission (CEC) certification ensures energy efficiency compliance. JJR Lab provi...
What Does the Canadian IC Mark Mean? What Does the Canadian IC Mark Mean?
02 .28.2026
The IC mark means ISED approval for Canada; wireless needs EMC+RF (RSS/ICES) tests. Cost USD3k–8k, 4...

Leave Your Message