EMC China Lab

What is a UL Test Report?

Views :
Update time : 2024-06-08

Introduction to UL Test

As Amazon's strategic position in global commerce continues to improve, products with electrical connections need relevant UL reports to be listed on Amazon. Test reports issued by laboratories with ISO 17025 qualifications are required for normal sales and restoration of links. If the products purchased by competitors or customers do not have safety reports of relevant standards, competitors or customers will entrust American lawyers to send letters to Amazon, requesting that the company's products be stopped from being sold, and apply for court proceedings to destroy all of the company's products on Amazon, which may mean that the company is basically driven out of the North American market. Many sellers reported receiving relevant email notifications, and their products were suspended from sale and listings were removed from the shelves due to the inability to provide ul test reports within the specified time.

 

The difference between UL certification and UL test report

UL certification: a voluntary certification that requires product testing and factory audits, which are conducted every quarter. It is expensive, time-consuming, and the factory audits are very strict.

UL test report: After the product is tested according to the corresponding UL standard, a qualified test report will be issued. Low cost, short cycle, no factory inspection required. Can be used for Amazon audit, invalid for customs clearance.

 

2. UL Certification Mark

Logo not found

 

3. UL Certification Standards

product

Safety Standards

Power Products

UL62368-1/ul1310/UL1012/ul2056/

UL2089/UL458/UL697/UL60601-1

IT/AV Products

UL62368-1

Wireless Products

UL62368-1

Lighting products

UL1598/UL153/UL1786/UL1573/

UL588/UL2108/UL924/UL1993/UL8750

Battery Products

ul1642/ul2054/UL2056/UL2271/UL2580/ul1973

Electric vehicle products

UL2849/UL2272

Home appliance

UI1007/UL1005/UL1028/UL1083/UL982/ul1026

Industrial Transformer

UL1310/UL1012/UL506/UL1561/UL1562/

UL1585/UL1876/UL1411/UL397/UL697

 

IV. UL Required Information

1. Company information form and business license copy (for customers applying for UL for the first time).

2. Product description: product name, product model, etc.

3. Parts list: Provide the name and model, rating, and manufacturer information of the product parts. If the parts have been ul certified, please indicate the UL file number of the parts. If there are multiple suppliers for a certain part, they can be provided together.

4. Performance and specifications: such as size, rated voltage, current, frequency and power, etc.

5. Structural drawing or exploded view: Structural drawing of the product. Please indicate the names of each part in the drawing so that they correspond one to one with the parts list.

6. Circuit schematic diagram Please provide the circuit schematic diagram: PCB schematic diagram PCB LAYOUT.

7. Product photos, instructions for use, safety precautions or installation instructions, etc.

 

5. UL Certification Process

1.The applicant submits an application.

2. The applicant fills in the application form and provides instructions and technical documents.

3. Determine the test standards and test items and provide a quotation.

4. The applicant confirms the quotation and submits samples and relevant technical documents.

5. A fee notice will be issued to the applicant, who will pay the certification fee according to the fee notice.

6. Arrange products for testing.

7. If the test fails, notify the applicant and allow the applicant to improve the product.

This process continues until the test is passed. The applicant should make changes to the technical information in the original application to reflect the actual situation after the change.

8. Provide UL test report to the applicant if the test is qualified.

 

VI. Certification cycle and validity period

The UL test report cycle is 5-7 working days.

If the American UL test standards used are not updated, the UL test report is valid for a long time.

 

7. Factory Inspection

UL test reports do not require factory inspection

 

US UL test report

Logo not found

·Test content: Safety regulations
·Applicable products:
·Is it mandatory: Yes/No
·Factory inspection: Yes/No
·Local agent: Yes/No
·Plug type: *standard/**type
·Voltage requirement: **V
·Application method: Direct application; Transfer application (**certificate can be transferred, **report can be transferred)
·Certificate validity period: **years/long term (re-application is required for standard change)
·Other supplements:


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
Children's Footwear CPSIA Testing Service Children's Footwear CPSIA Testing Service
04 .24.2026
Children’s footwear CPSIA testing meets U.S. standards (CPSIA,16 CFR), covering lead, phthalates, ca...
Adult Footwear CA65 Package Testing Adult Footwear CA65 Package Testing
04 .24.2026
Adult Footwear CA65 Package Testing ensures California Proposition 65 compliance by detecting lead, ...
Footwear Material RSL Chemical Testing Footwear Material RSL Chemical Testing
04 .24.2026
JJR LAB tests footwear materials for EU REACH, US CPSIA, China GB, precisely screening azo dyes, hea...
Medical Device FDA Testing Medical Device FDA Testing
04 .24.2026
FDA classifies devices (I–III); U.S. entry requires classification, standards (ISO 10993, IEC 60601)...
EMC Testing for Medical Devices EMC Testing for Medical Devices
04 .24.2026
EMC testing ensures devices control emissions and immunity, protect users, and comply with IEC 60601...
How Long Does It Take to Get an FCC ID for Wireles How Long Does It Take to Get an FCC ID for Wireles
04 .23.2026
FCC ID certification for wireless devices takes 1–4 weeks, covering standards like 47 CFR Part 15, P...
How much does FCC Part 15 certification cost in 20 How much does FCC Part 15 certification cost in 20
04 .23.2026
FCC Part 15 certification cost in 2026: SDoC from $400, FCC ID $1100–3500, with 1–4 week timelines. ...
Amazon France UIN Service Amazon France UIN Service
04 .22.2026
UIN is the key French EPR number to upload—not the certificate—to ensure compliance, avoid fees, and...

Leave Your Message