EMC China Lab

Submitted UL4200A report rejected by Amazon?

Views :
Update time : 2024-06-13

ul4200a rejected by the platform? Not approved? Amazon's new regULations state that the review period is more than one week. Clients who submitted earlier have already been approved.

 

1. The gcc certificate requires information about the US importer.

2. The gcc certificate needs to indicate the production date and production location (at least including city + country).

3. The outer packaging needs to be marked with warning labels and battery voltage.

4. If the battery is replaceable, the instruction manual needs to include battery warning labels, etc.

 

ul4200 certification cycle: 1 week

Sample machine (complete unit): 2 units

 

Product image identification (warning icons, product name, model, place of origin: e.g., Made in China)

 

Submitted UL4200A report rejected by Amazon?(图1)



Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
UL1310 Certification Guide for Power Supplies UL1310 Certification Guide for Power Supplies
03 .20.2026
UL1310 defines Class 2 power supplies with limited voltage, current, and power. Certification needs ...
Amazon ASTM F2057 Formaldehyde Test Report Amazon ASTM F2057 Formaldehyde Test Report
03 .20.2026
Amazon mandates safety compliance for clothing storage units, requiring ASTM F2057 or 16 CFR 1261, p...
Key of LFGB Testing for Different Food Contact Mat Key of LFGB Testing for Different Food Contact Mat
03 .20.2026
LFGB compliance is essential for EU access, with tests like migration, heavy metals and durability f...
IECEE CB Certification, Global Compliance Certific IECEE CB Certification, Global Compliance Certific
03 .20.2026
IECEE CB is a global passport: one test enables multi-country certification, cutting cost/time; base...
2026 EU CE Compliance: EUDAMED, DPP, Standards Exp 2026 EU CE Compliance: EUDAMED, DPP, Standards Exp
03 .20.2026
2026 EU CE shifts to full digital, traceable lifecycle via EUDAMED, DPP, and new standards; test sta...
Data Cables & Adapters EU & US Compliance Data Cables & Adapters EU & US Compliance
03 .19.2026
Data cables & adapters for EU/US meet CE (LVD, EMC, RoHS) and FCC Part 15B/Prop 65; tests cover ...
UN38.3 Test Report for Air Pumps UN38.3 Test Report for Air Pumps
03 .19.2026
Air pump export with lithium batteries requires UN38.3 testing, ensuring safety through 8 tests befo...
How much does an EN 50155 test report cost? How much does an EN 50155 test report cost?
03 .18.2026
EN 50155 test costs 2030 USD by JJR LAB, covering electrical, environmental, mechanical and EMC test...

Leave Your Message