1. Accelerated Aging (1 year)
- Testing Standard: YY/T 0681.1-2018, ASTM F 1980-16
- Duration: 4 weeks
2. Vacuum Leak
- Testing Standard: ASTM D3078-02, GB15171
- Duration: 2 weeks
3. Dye Penetration
- Testing Standard: YY/T 0681.4-2010, ASTM F1929-2015
- Duration: 2 weeks
4. Seal Peel/Peel Strength
- Testing Standard: YY/T 0681.2-2010, ASTM F88-15
- Duration: 2 weeks
5. Microbial Barrier (Wet Method)
- Testing Standard: YY/T 0681.14
- Duration: 2 weeks
6. Sterility
- Testing Standard:
- Chinese Pharmacopoeia 2020 Edition, Part IV, General Chapter (1101) Sterility Test
- United States Pharmacopeia - National Formulary General Chapter <71> Sterility Test (Effective 2013)
- Duration: 3 weeks
7. Appearance (Visual Inspection)
- Testing Standard: YY/T 0681.11-2014, ASTM F1886/F1886M-16
- Duration: 2 weeks
8. Burst Test
- Testing Standard: YY/T 0681.3-2016, ASTM F1140/F1140M-13(2020)e1
- Duration: 2 weeks
9. Bubble Test
- Testing Standard: YY/T 0681.5-2010, ASTM F 2096-11
- Duration: 2 weeks
### Packaging Validation
10. Packaging Validation (1 Year, 1 Node, 1 Batch)
- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble
- Duration: 8 weeks
11. Packaging Validation (1 Year, 2 Nodes, 1 Batch)
- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble
- Duration: 8 weeks
12. Packaging Validation (1 Year, 2 Nodes, 3 Batches)
- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble
- Duration: 8 weeks
13. Packaging Validation (2 Years, 1 Node, 1 Batch)
- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble
- Duration: 12.5 weeks
24-hour online customer service at any time to respond, so that you worry!